Storm-door installation involves more than fastening a pre-hung unit to the outside of the house. The frame must be positioned plumb and level, hardware must clear the primary door, and the closer and bottom sweep must be adjusted so the door opens, closes and latches correctly.
Our process includes:
1. Entrance and Product Review
We discuss how the entrance is used, the amount of glass and ventilation desired, preferred colours, hardware and budget. If the main entry door also needs attention, Imperial can review the complete entrance through its exterior door replacement services.
2. Detailed Measurement
The opening is measured in several places because older brickmould and thresholds are not always perfectly square. Handle locations, sill conditions, mounting depth and swing clearance are recorded before the storm door is ordered.
3. Custom Order and Scheduling
Once the design and specifications are approved, the storm door is ordered for the measured opening. Lead time depends on the selected model, colour, glass, screen, hardware and current manufacturing schedule.
4. Removal and Opening Preparation
When replacement is part of the agreed scope, the old storm door and mounting components are removed. The brickmould and sill area are checked before the new unit is installed. Any repair or additional preparation that falls outside the original scope is discussed with the homeowner.
5. Installation and Adjustment
The new frame is secured, and the handle, latch, closer, safety chain and bottom sweep are fitted and adjusted as required by the selected system. The installer tests the swing, closing speed, latch and clearance, then explains basic operation and care.
Learn more about Imperial's approach to professional door installation.